
FMG seek quality expansion
The Fortescue Metals Group undergoing rapid expansion at their Christmas Creek minesite has awarded Tristar Water Solutions to design,construct and install a 700 person SBR wastewater treatment plant. A customised design to also assist with the screening and distribution of flows to other smaller treatment plants in the vicinity was also required. The integration with other infrastructure within the site also required Tristar to engineer disposal and control systems in a reliable and easy to understand format.